Why is waterproofing bathrooms required




















So, DIY is off limits to everybody but skilled tradespeople who really know how to waterproof a bathroom. Across Australia, costs to waterproof a bathroom vary by location. The primer should be applied to the floor and also to the walls up to a height of cm, with a normal paint roller or brush. After the primer is dry, the next step is to fill any gaps between floor and wall, around the vanity, near the shower, at the shower base, etc. First remove any old silicone with a paint scraper, Stanley knife, or something similar, then apply the new silicone.

Wait approximately 24 hours for it to dry, sealing any potential gaps. To ensure your bathroom waterproofing is completed with a straight edge, apply masking tape as you would when painting.

Again, this can be applied with a roller or brush. Starting at the back corner for ease of access, apply around the wall up to the height of your masking tape and then where the wall and floor meet. A waterproof membrane should then be added to the wall and the cracks in the floor. First cut the product into appropriate lengths and place it into position. Then paint over it with the waterproofing agent to stick it down.

Ensure you paint over it completely and leave no gaps. Call for a FREE report on the condition of your bathroom waterproofing. Waterproofing is done at different stages of building. Some systems are set up before the floors and walls are laid down, and the rest is put in place after everything has been established.

The most common type of waterproofing is the membrane. Before the floor and walls are laid, the surface is cleaned and primed, then followed by the application of a membrane waterproofing agent that is either painted, sprayed, or laid down as a sheet. Spraying and painting are the most common techniques used to waterproof wet areas. After the floor and walls are established, there are other types of waterproofing set up. Liquid sealant is applied to tiles on the shower wall and floor, which serves as a protective barrier to stop water from breaching the surface.

Silicone sealant is also used to seal gaps between the floor and wall joints. Overall, these combined systems help waterproof your whole bathroom. Flashing materials must be a material that is deemed waterproof under the Standard. Zincalume could only be used as a backing material behind sheeting or substrates and then the corner or junction waterproofed as per the Standard. Floor wastes are not required in bathrooms of Class 1 buildings but are required to be provided for in Class 2 buildings where the floor of the bathroom is located above another sole occupancy unit.

There is no specific requirement for a vanity unit that sits on a floor of the bathroom that requires full waterproofing of the floor, but as a precaution, the vanity should be installed on top of the finished floor so as not to compromise the waterproofing requirements of the floor. Sealant should then be applied between the floor and the base of the unit to prevent moisture ingress into the panel material of the vanity unit.

Alternatively, if fitted before the tiling, the membrane should be returned up the vertical surface of the vanity to the top of the finished floor level. The Standard recommends that door jambs and architraves be installed above floor tiling where possible.

ABIS building and pest inspections are conducted to the highest standard by building inspectors with a minimum of 10 years experience together with the highest professional qualifications in their field. ABIS has been in business over 27 years conducting both building and timber pest inspections.

Our highly recommended home inspectors are all long term trusted employees not here today gone tomorrow sub-contractors. When you book a pre-purchase inspection with ABIS, our friendly local they know the area and are not in a interstate or overseas call centre staff will make the whole process easy for you.

Our Office team make all the arrangements with you, your agent, the vendor, the tenant if there is one and you will be sent an email to confirm the inspection time along with a pre-engagement letter which covers the scope of the inspection. Good communication and local knowledge are key to you getting the most out of your building and pest inspection.

We are always happy to answer all your questions and you are most welcome to be on site when we do the inspection.

Our technology, systems and processes also mean you get your high quality report shortly after your inspection is completed. Building and Pest Inspection. Arrange a Building Inspection. View Sample Reports Detailed, easy to understand reports. Building and Pest Report. Handover Report. Inspection FAQs. Waterproofing of wet areas, such as shower recesses, has consistently been among the most commonly recurring building defects reported by homeowners. Before starting the installation process, please check if the floors and walls are clean.

To achieve optimal bonding, all surfaces should be clean and free of adhesion-reducing substances e. Make sure that the floor is absolutely grease-free and dry. Start with applying the corner pieces. Make sure that you cover all the corners using the included inner and outer corner pieces.

First, remove the foil from the bottom and apply the corner piece to the floor. Next, remove the foil from other parts and apply to the wall.

Corner pieces are the solution of how to waterproof shower walls. Cover all corners by with the corner sealing tape. Tip: Always remove the protective foil when applying the sealing membrane, sleeves and sealing tape.

Also be careful not to damage the membrane while removing the foil. Use the included wall sleeves to seal all plumbing fittings and pipes coming out of the walls or floor. To apply the waterproofing membrane, remove about 10 centimeters of protective foil on the backside and work down removing the foil.

Always apply the membrane from top to bottom and make sure it overlaps with the corner sealing tape. Again be careful not to damage the membrane while removing the foil. Correction: To repair or continue a strip of waterproofing membrane place some corner tape beneath the strip and overlap the next membrane on top of the tape.

Finishing: Use the finishing tape to cover the last strip of non-fleece material. When sealing the shower floor Make sure that the waterproofing membrane completely covers the shower drain and ensure sufficient overlap between the sealing membranes. Important: Watertightness is not guaranteed if the seam covers the shower drain.